December 5th was the walk-thru for the house. We walked through and pointed out all the minor things that the contractors need to fix. We took some pictures after the walk-thru:
Kitchen

Dining Room

Looking towards the Living Room

This is where the flat screen TV will go

Front Door entrance

1st floor Hallway

1st floor bathroom

Medallion at the front door entrance

Floor of the Master Bathroom

Master bath

Master Bath

One of the bedrooms (Dave modeling how the cat will lie in the sun)

2nd floor bathroom floor

The "tower" room

Looking down the stairs

Exterior
December 7th was our closing!
No comments:
Post a Comment